Skip to content
Specification Guide

Fire-Rated Ceiling Assemblies: UL Designs & Code Requirements

What architects, GCs, and facility managers need to know about fire-rated ceilings — from the contractor who installs them.

Fire-rated ceilings aren't optional — they're code. When the building code requires a fire-resistance-rated floor/ceiling or roof/ceiling assembly, every component of that assembly has to match a tested and listed UL design. Swap the wrong tile, use the wrong grid, or skip the firestop caulk at a penetration, and the rating is void. That's not a theoretical risk — fire marshals and inspectors check this, and insurance companies care about it a lot.

How Fire-Rated Assemblies Work

A fire-rated ceiling isn't just a fire-rated tile. It's a complete assembly — the structure above, the grid, the tiles, the hanger wires, and every penetration through the assembly. Each component is specified in a UL design number that defines exactly what materials and methods are required.

The assembly is tested as a system. A 1-hour rating means the entire assembly — not just one component — withstood fire exposure for 1 hour in a controlled test. Change any component and you've potentially invalidated the test results.

Common UL Design Numbers for Ceiling Assemblies

These are some of the most frequently specified UL designs in commercial construction:

  • L501: Steel bar joists with concrete on metal deck above, suspended ceiling below. 1-hour and 2-hour options. One of the most common designs in multi-story office buildings.
  • L502: Similar to L501 but with different structural configurations. Check the specific sub-listing for your structure type.
  • D501: Roof/ceiling assemblies with steel deck and insulation above, suspended ceiling below. Common in single-story retail and warehouse spaces.
  • G512: Specific designs for gypsum board assemblies with suspended acoustical ceilings as part of the fire membrane.
  • M500-series: Membrane ceiling assemblies where the ceiling provides the fire rating independent of the structure above.

Every UL design has a detailed listing that specifies the exact grid, tile, hanger wire gauge, hanger wire spacing, and attachment method. The listing is the law — no substitutions without engineering evaluation.

Fire-Rated Ceiling Tiles

Not every ceiling tile is fire-rated. Standard mineral fiber tiles from Armstrong, USG, and CertainTeed are typically Class A fire-rated (flame spread ≤25, smoke developed ≤50), but that's not the same as being part of a fire-rated assembly.

For use in fire-rated assemblies, tiles must be specifically listed in the UL design. The most common fire-rated tiles:

  • Armstrong Fire Guard: Specifically designed and tested for fire-rated assemblies. Available in multiple sizes and edge profiles.
  • USG Halcyon: Fire-rated mineral fiber tiles listed in multiple UL designs.
  • CertainTeed Fire-Rated: Various panels listed for specific UL assemblies.

The key: check the UL listing for your specific assembly. The tile that's listed may not be the cheapest or most common — but it's the one that maintains the fire rating.

Grid Requirements in Fire-Rated Assemblies

The grid system in a fire-rated assembly has specific requirements that go beyond a standard ceiling:

  • Expansion joints: Fire-rated grids must have expansion capability to accommodate thermal expansion during a fire. Most listed grids have built-in expansion features at splice points.
  • Hold-down clips: Tiles must be restrained from lifting during a fire (positive pressure in the plenum). Many UL designs require hold-down clips at every tile.
  • Hanger wire gauge: Typically 12-gauge galvanized, but the UL design may specify a heavier gauge for certain applications.
  • Maximum hanger spacing: Usually 4' on center, but fire-rated assemblies may specify tighter spacing in some designs.

Penetrations: The Weak Link

Every light fixture, HVAC diffuser, sprinkler head, and access panel that penetrates the ceiling membrane is a potential weak link in the fire rating. Each penetration must be firestopped according to the UL design or a separate UL firestop system.

  • Light fixtures: Must be fire-rated fixtures or installed with fire-rated enclosures above the ceiling. Standard troffers are not fire-rated.
  • HVAC diffusers: The ductwork connection to the diffuser must maintain the fire rating. Fire dampers are required where ducts penetrate fire-rated assemblies.
  • Sprinkler heads: Typically permitted in fire-rated ceilings with specific escutcheon plates and clearances defined in the UL listing.
  • Electrical and data: Conduit and cable penetrations through the ceiling membrane require firestop caulk, putty pads, or listed firestop devices.

Common Mistakes That Void Fire Ratings

We see these on projects where the fire-rated assembly wasn't properly coordinated or supervised:

  • Wrong tile substitution: A non-listed tile is used because the specified tile was backordered. This voids the assembly rating.
  • Missing hold-down clips: Tiles are laid in without clips. In a fire, positive pressure lifts the tiles and the fire breaks through.
  • Unsealed penetrations: A light fixture is installed without a fire-rated enclosure. The electrician cuts the hole, installs the fixture, and nobody firestops it.
  • Modified grid: A piece of main tee is cut to go around an obstruction. The modified section isn't supported per the UL design.
  • Missing hanger wires: Hanger wires are omitted because of above-ceiling obstructions. The grid isn't supported per the listing.

California-Specific Requirements

California adopts the International Building Code (IBC) with amendments as the California Building Code (CBC). Relevant to fire-rated ceilings:

  • CBC Section 714: Fire-resistance-rated assemblies, including penetrations and joints
  • CBC Section 803: Interior finish requirements (ceiling tile flame spread/smoke developed)
  • California State Fire Marshal (CSFM) listing: Some jurisdictions require CSFM listing in addition to UL listing

Combine these with California seismic requirements and you've got a ceiling that needs to survive both fire and earthquakes. The seismic bracing and the fire-rating components need to work together — they're not separate systems.

For Architects and Specifiers

When specifying a fire-rated ceiling assembly:

  1. Identify the required fire-resistance rating from the building code (IBC Table 601 or specific occupancy requirements)
  2. Select a UL design that matches your structural system
  3. Specify the exact tile, grid, and accessories listed in that design
  4. Call out penetration requirements and firestop systems on the drawings
  5. Require submittals from the ceiling contractor showing compliance with the UL listing

Need help selecting the right fire-rated assembly for your project? Contact us — we work with architects and GCs on spec review and product selection.